๐ผ CC3.2-4 Estimates Significance of Risks Identified
- Contextual name: ๐ผ CC3.2-4 Estimates Significance of Risks Identified
- ID:
/frameworks/soc-2/cc3/02/04
- Located in: ๐ผ CC3.2 The entity identifies risks to the achievement of its objectives\ \ across the entity and analyzes risks as a basis for determining how the\ \ risks should be managed.
Descriptionโ
Identified risks are analyzed through a process that includes estimating the potential significance of the risk.
Similarโ
- Internal
- ID:
dec-c-2b5a2142
- ID:
Sub Sectionsโ
Section | Sub Sections | Internal Rules | Policies | Flags |
---|