๐ผ CP-10(1) System Recovery and Reconstitution | Contingency Plan Testing
- Contextual name: ๐ผ CP-10(1) System Recovery and Reconstitution | Contingency Plan Testing
- ID:
/frameworks/nist-sp-800-53-r5/cp/10/01
- Located in: ๐ผ CP-10 System Recovery and Reconstitution
Descriptionโ
[Withdrawn: Incorporated into CP-4.]
Similarโ
- Internal
- ID:
dec-c-e866530f
- ID:
Sub Sectionsโ
Section | Sub Sections | Internal Rules | Policies | Flags |
---|