Skip to main content

💼 CP-7 Alternate Processing Site

  • Contextual name: 💼 CP-7 Alternate Processing Site
  • ID: /frameworks/nist-sp-800-53-r5/cp/07
  • Located in: 💼 CP Contingency Planning

Description​

a. Establish an alternate processing site, including necessary agreements to permit the transfer and resumption of [Assignment: organization-defined system operations] for essential mission and business functions within [Assignment: organization-defined time period consistent with recovery time and recovery point objectives] when the primary processing capabilities are unavailable; b. Make available at the alternate processing site, the equipment and supplies required to transfer and resume operations or put contracts in place to support delivery to the site within the organization-defined time period for transfer and resumption; and c. Provide controls at the alternate processing site that are equivalent to those at the primary site.

Similar​

  • Internal
    • ID: dec-c-3cd0e06b

Similar Sections (Give Policies To)​

SectionSub SectionsInternal RulesPoliciesFlags
💼 FedRAMP High Security Controls → 💼 CP-7 Alternate Processing Site (M)(H)4
💼 NIST CSF v2.0 → 💼 PR.IR-04: Adequate resource capacity to ensure availability is maintained

Sub Sections​

SectionSub SectionsInternal RulesPoliciesFlags
💼 CP-7(1) Alternate Processing Site _ Separation from Primary Site
💼 CP-7(2) Alternate Processing Site _ Accessibility
💼 CP-7(3) Alternate Processing Site _ Priority of Service
💼 CP-7(4) Alternate Processing Site _ Preparation for Use
💼 CP-7(5) Alternate Processing Site _ Equivalent Information Security Safeguards
💼 CP-7(6) Alternate Processing Site _ Inability to Return to Primary Site