πΌ MP-6(2) Equipment Testing (H)
- Contextual name: πΌ MP-6(2) Equipment Testing (H)
- ID:
/frameworks/fedramp-high-security-controls/mp/06/02
- Located in: πΌ MP-6 Media Sanitization (L)(M)(H)
Descriptionβ
Test sanitization equipment and procedures [FedRAMP Assignment: at least every six (6) months] to ensure that the intended sanitization is being achieved.
MP-6 (2) Additional FedRAMP Requirements and Guidance:
Guidance: Equipment and procedures may be tested or validated for effectiveness.
Similarβ
- Sections
/frameworks/nist-sp-800-53-r5/mp/06/02
- Internal
- ID:
dec-c-a8b4d717
- ID:
Similar Sections (Take Policies From)β
Section | Sub Sections | Internal Rules | Policies | Flags |
---|---|---|---|---|
πΌ NIST SP 800-53 Revision 5 β πΌ MP-6(2) Media Sanitization _ Equipment Testing |
Sub Sectionsβ
Section | Sub Sections | Internal Rules | Policies | Flags |
---|