💼 AU-12(1) System-wide and Time-correlated Audit Trail (H)
Description​
Compile audit records from [FedRAMP Assignment: all network, data storage, and computing devices] into a system-wide (logical or physical) audit trail that is time-correlated to within [Assignment: organization-defined level of tolerance for the relationship between time stamps of individual records in the audit trail].
Similar​
- Sections
/frameworks/nist-sp-800-53-r5/au/12/01
- Internal
Similar Sections (Take Policies From)​
Sub Sections​
Section | Sub Sections | Internal Rules | Policies | Flags |
---|